1. Implement of company’s regulations and departments decision, obey the leadership arrangements and finish the assignment. Responsible for all organization, scheduling and processing of key technical problems under the jurisdiction.
2. Daily inspection to the jurisdiction section for more than half an hour.
3. Make timely reporting and handling the sudden accident in the jurisdiction section, write failure analysis report if need.
4. Examination and approval spare parts, raw material consumption, inventory levels of the jurisdiction sections, in order to keep maintenance plan smooth and the normal operation of equipment.
5. In the premise of stable supply, optimize of the utility system to reach the efficient and economical operation.
6. Provide the technical transformation project, plan and budget of jurisdiction sections for approval. Participate in the project acceptance and commissioning until the production operation, and supervise technical data archiving
7. Audit and sign the jurisdiction sections attendance
8. Review the monthly work summary from the direct subordinates, make monthly report of work summary and plan, submit to the superior before 25th of every month.
9. Actively participate in various training, and constantly improve the technology and management level, improve own quality
10. Do the economic accounting and cost analysis for dynamic medium, carry out energy saving activities gradually
11. Strengthen the consciousness of environmental protection in the daily environmental management work.
12. Make regular monthly inspection of environment / risk factors to the jurisdiction sections.
13. Supervise and ensure the subordinates’ work must be in accordance with the GMP/ISO9001, ISO50001, ISO14001 and OHSAS18001 environmental risk, security standard and company’s rules and regulations. Comply with laws and regulations, safety risk prevention, energy saving and emission reduction, continuous improvement.
14. Strict control of each procedure in the daily work to strive for excellence constantly, reduce the energy consumption per unit
中国和瑞典两国间的第一家合资企业,于1982年签订合资合同,1987年开始商业性生产,总投资额4510万美元。工厂位于风光秀丽的太湖之滨——江苏无锡,占地约18万平方米。该公司的GMP已经到西方国家的实践水平。